Assessment Year | 2025 |
---|---|
Principal Product | CV Flanges, Diff Cases, Diff Lockout Collars, Drive Pinion Forgings, Helical Gears, Input Shafts, Output Gears, Diff Pinions, Side Gears, Spindles |
NAICS | 332111: Iron and Steel Forging |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 316 |
Plant Area |
152,050
ft2
|
Annual Production | 10,846,374
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,687,471 | 39,774,481 |
kWh
|
$0.042 | |
Electricity Demand | $984,499 | 160,560 |
kW-mo/yr
|
$6.13 | |
Electricity Fees | $(-218,572.0) | - |
|
- | |
Natural Gas | $232,406 | 22,634 |
MMBtu
|
$10.27 | |
Waste Disposal Costs | |||||
Water Usage | $36,844 | 16,311 |
Tgal
|
$2.26 | |
Water Disposal | $207,944 | 16,311 |
Tgal
|
$12.75 | |
TOTAL YEARLY COSTS | $2,930,592 | ||||
RECOMMENDED SAVINGS* | $418,315 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $1,852 | $60 | - | - | - | $1,852 | |
02 | 4.721: Initiate a program to acquire iso certification | $78,715 | $15,000 |
$69,186
1,630,754
kWh
|
$9,529
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,409 | $1,885 |
$9,409
221,911
kWh
|
- | - | - | |
04 | 3.6192: Use a less expensive method of waste removal | $263,515 | $80,000 |
$(-30,424.8)
(-835,847)
kWh
|
- | - | $293,940 | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $12,543 | $4,000 |
$12,543
298,543
kWh
|
- | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $11,177 | $11,250 |
$11,177
263,619
kWh
|
- | - | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,933 | $9,000 | - | - |
$4,933
-
Tgal
|
- | |
08 | 2.9114: Use solar heat to make electricty | $36,172 | $520,500 |
$36,172
861,260
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $418,315 | $641,695 |
$108,063
2,440,240
kWh
|
$9,529
-
MMBtu
|
$4,933
-
Tgal
|
$295,791 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs