| Assessment Year | 2024 |
|---|---|
| Principal Product | Fish |
| NAICS | 311710: Seafood Product Preparation and Packaging |
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $10 M to 50M |
| # of Employees | 47 |
| Plant Area |
23,000
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 2,496
hrs
|
| Location (State) | Hawaii |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $255,689 | 771,345 |
kWh
|
$0.33 |
| Electricity Demand | $25,314 | 1,870 |
kW-mo/yr
|
$13.54 |
| TOTAL YEARLY COSTS | $281,003 | |||
| RECOMMENDED SAVINGS* | $149,158 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $119,267 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $4,235 | - |
$4,235
12,775
kWh
|
- | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $3,992 | - |
$3,992
12,041
kWh
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $425 | $140 |
$355
1,070
kWh
|
$70
-
kW-mo/yr
|
- | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $20,979 | $27,525 |
$19,923
60,100
kWh
|
$1,056
-
kW-mo/yr
|
- | - | |
| 05 | 2.2626: Avoid frost formation on evaporators | $10,643 | $13,568 |
$2,519
7,600
kWh
|
$8,124
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,227 | $12,256 |
$7,114
21,461
kWh
|
$1,173
-
kW-mo/yr
|
$170 | $(-230.0) | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,248 | $52,290 |
$19,248
58,064
kWh
|
- | - | - | |
| 08 | 2.2511: Insulate bare equipment | $166 | $750 |
$166
501
kWh
|
- | - | - | |
| 09 | 2.9114: Use solar heat to make electricty | $81,243 | $249,045 |
$81,243
245,078
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $149,158 | $355,574 |
$138,795
418,690
kWh
|
$10,423
-
kW-mo/yr
|
$170 | $(-230.0) | ||
| TOTAL IMPLEMENTED | $119,267 | $289,716 |
$117,028
353,026
kWh
|
$2,299
-
kW-mo/yr
|
$170 | $(-230.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs