ITAC Assessment: UU0275
ITAC logo
ITAC Assessment: UU0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Machine Parts and Fabricated Metals
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 95,000
ft2
Annual Production 250,000
units
Production Hrs. Annual 5,800
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,642 3,981,499
kWh
Electricity Demand $134,673 8,259
kW-mo/yr
Electricity Fees $91,067 -
Natural Gas $5,462 592
MMBtu
Fuel Oil #1 $5,580 211
MMBtu
TOTAL YEARLY COSTS $380,424
RECOMMENDED SAVINGS* $59,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings
01 2.3212: Optimize plant power factor $5,030 $15,960 - $5,030
-
kW-mo/yr
- -
02 2.8114: Change rate schedules or other changes in utility service $33,900 $8,025 - - $33,900 -
03 3.1194: Use automatic flow control $1,516 $5,258 $811
22,540
kWh
$704
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $2,066 $2,066 $1,391
38,640
kWh
$675
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $12,307 $10,880 $11,384
316,220
kWh
$923
-
kW-mo/yr
- -
06 2.8226: Increase efficiency of trucks $4,820 $8,740 $(-560.0)
(-15,650)
kWh
- - $5,380
-
MMBtu
TOTAL RECOMMENDED $59,639 $50,929 $13,026
361,750
kWh
$7,332
-
kW-mo/yr
$33,900 $5,380
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs