ITAC Assessment: AM0119
ITAC logo
ITAC Assessment: AM0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PROCESSED MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area
n/a
Annual Production 8,900,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,549 1,411,489
kWh
Natural Gas $6,170 1,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $148 $510
9,965
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $420 - $420
16,999
kWh
-
03 2.7141: Lower light fixtures in high ceiling areas $250 $260 $250
10,258
kWh
-
04 2.7261: Install timers and/or thermostats $103 $320 $18
586
kWh
$85
-
MMBtu
TOTAL RECOMMENDED $1,283 $728 $1,198
37,808
kWh
$85
-
MMBtu
TOTAL IMPLEMENTED $1,283 $728 $1,198
37,808
kWh
$85
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs