ITAC Assessment: NL0116
ITAC logo
ITAC Assessment: NL0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 110,000
ft2
Annual Production 1,200
units
Production Hrs. Annual 6,051
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,179 45,396
kWh
Electricity Demand $50,007 3,660
kW-mo/yr
Electricity Fees $5,038 -
Natural Gas $87,058 9,283
MMBtu
Other Gas $6,856 1
MMBtu
Waste Disposal Costs
Water Usage $999 181
Tgal
Other Liquid (non-haz) $139 1
gal
TOTAL YEARLY COSTS $152,276
RECOMMENDED SAVINGS* $66,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $45,419 $54,600 $2,039
42,478
kWh
$1,151
-
kW-mo/yr
- - - - - $42,229
02 3.5248: Separate and recycle scrap metal to foundry or for sale $13,580 $600 - - - - - - $13,580 -
03 2.8121: Apply for tax-free status for energy purchases $5,745 $2,300 - - $4,580 - $1,165
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $828 $4,650 $828
17,257
kWh
- - - - - - -
05 2.2511: Insulate bare equipment $566 $655 - - - $566
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $411 $423 $45
944
kWh
$26
-
kW-mo/yr
- - - $340 - -
TOTAL RECOMMENDED $66,549 $63,228 $2,912
60,679
kWh
$1,177
-
kW-mo/yr
$4,580 $566
-
MMBtu
$1,165
-
MMBtu
$340 $13,580 $42,229
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs