ITAC Assessment: SD0448
ITAC logo
ITAC Assessment: SD0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Reclaimed Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 13
Plant Area 20,000,000
ft2
Annual Production 16,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,003,660 17,323,115
kWh
Electricity Fees $278,160 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $239,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $233,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $6,239 $100 $6,239
107,761
kWh
-
02 2.7132: Install timers on light switches in little used areas $10,195 $3,320 $10,195
176,085
kWh
-
03 2.5195: Change product design to reduce energy requirements $122,834 $75,600 $122,834
2,121,492
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,602 $11,102 $8,602
148,562
kWh
-
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $92,055 $415,000 $164,872
2,842,620
kWh
$(-72,817.5)
TOTAL RECOMMENDED $239,925 $505,122 $312,742
5,396,520
kWh
$(-72,817.5)
TOTAL IMPLEMENTED $233,686 $505,022 $306,503
5,288,759
kWh
$(-72,817.5)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs