Assessment Year | 2025 |
---|---|
Principal Product | Bottled Water |
NAICS | 312112: Bottled Water Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 15 |
Plant Area |
76,345
ft2
|
Annual Production | 11,000,000
units
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $163,018 | 2,672,212 |
kWh
|
$0.061 | |
Electricity Demand | $263,937 | 16,223 |
kW-mo/yr
|
$16.27 | |
Natural Gas | $9,046 | 619 |
MMBtu
|
$14.61 | |
Fuel Oil #2 | $14,400 | 110 |
MMBtu
|
$130.91 | |
Waste Disposal Costs | |||||
Water Usage | $6,367 | 600 |
Tgal
|
$10.61 | |
Solid Waste (non-haz) | $10,680 | 34,560 |
lb
|
$0.31 | |
TOTAL YEARLY COSTS | $467,448 | ||||
RECOMMENDED SAVINGS* | $151,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $12,408 | - | - | - | - |
$10,680
-
lb
|
- | $1,728 | |
02 | 2.7261: Install timers and/or thermostats | $10,625 | $35 |
$10,625
174,177
kWh
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,245 | $6,160 |
$1,723
28,282
kWh
|
$2,522
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $37,258 | $144,549 |
$(-1,142.0)
(-18,720)
kWh
|
- |
$14,400
-
MMBtu
|
- | $24,000 | - | |
05 | 2.7425: Clean or color roof to reduce solar load | $5,344 | $26,721 |
$5,344
87,607
kWh
|
- | - | - | - | - | |
06 | 2.9114: Use solar heat to make electricty | $25,948 | $187,200 |
$25,948
425,381
kWh
|
- | - | - | - | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $55,591 | $500,000 |
$1,279
20,967
kWh
|
- | - | - | $54,312 | - | |
TOTAL RECOMMENDED | $151,419 | $864,665 |
$43,777
717,694
kWh
|
$2,522
-
kW-mo/yr
|
$14,400
-
MMBtu
|
$10,680
-
lb
|
$78,312 | $1,728 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs