ITAC Assessment: MU0076
ITAC logo
ITAC Assessment: MU0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal and wood furniture
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,698 2,849,759
kWh
Electricity Demand $30,590 10,829
kW-mo/yr
Electricity Fees $35,708 -
Natural Gas $55,062 24,860
MMBtu
Other Energy $10,780 1
MMBtu
TOTAL YEARLY COSTS $386,838
RECOMMENDED SAVINGS* $115,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $33,420 $529,760 $32,716
367,593
kWh
$704
-
kW-mo/yr
- - -
02 3.1191: Change procedures / equipment / operating conditions $25,719 $59,150 - - - $25,719 -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $25,377 $56,072 $10,112
113,619
kWh
$1,481
-
kW-mo/yr
$13,784
-
MMBtu
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $12,567 $104,536 $(-2,749.0)
(-30,888)
kWh
$(-161.0)
-
kW-mo/yr
- - $15,477
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,912 $14,934 $7,816
87,816
kWh
$1,096
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,713 - $5,798
65,146
kWh
$915
-
kW-mo/yr
- - -
07 2.2511: Insulate bare equipment $1,132 $5,482 - - $1,132
-
MMBtu
- -
08 2.4322: Use or replace with energy efficient substitutes $139 - $133
1,492
kWh
$6
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $440 $230 $375
4,217
kWh
$65
-
kW-mo/yr
- - -
10 2.4322: Use or replace with energy efficient substitutes $412 $3,346 $394
4,422
kWh
$18
-
kW-mo/yr
- - -
11 2.7135: Install occupancy sensors $176 $647 $152
1,704
kWh
$24
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $115,006 $774,157 $54,747
615,120
kWh
$4,148
-
kW-mo/yr
$14,916
-
MMBtu
$25,719 $15,477
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs