Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,677

matching recommendations
$
$
ARC Water use
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0599 #06 Y:2025 Use closed cycle process to minimize waste water production $98,974 $65,000
MI0457 #08 Y:2025 Meter waste water $2,180 $2,348
MZ0371 #02 Y:2025 Meter recycled water (to reduce sewer charges) $4,583 $70,000
UU0267 #08 Y:2025 Use magnetic technology to treat water $12,294 $19,900
WV0678 #01 Y:2025 Minimize water usage $16,085 $31,231
NL0110 #04 Y:2025 Meter waste water $4,494 $2,400
NL0109 #02 Y:2025 Use flow control valves on equipment to optimize water use $12,694 $500
TT0330 #07 Y:2024 Use closed cycle process to minimize waste water production $6,469 $25,000
LE0594 #04 Y:2024 Use closed cycle process to minimize waste water production $42,706 $75,000
OK1134 #04 Y:2024 Change method of deionized water production $257,299 $103,000
AM0936 #03 Y:2024 Meter recycled water (to reduce sewer charges) $45,840 $1,490
NL0105 #05 Y:2024 Meter waste water $794 $950
TT0321 #12 Y:2024 Minimize water usage $830 -
TT0321 #04 Y:2024 Meter recycled water (to reduce sewer charges) $11,473 $10,000
TT0325 #10 Y:2024 Meter waste water $1,047 $1,100
UD1097 #03 Y:2024 Minimize water usage $1,616 -
UD1097 #02 Y:2024 Use flow control valves on equipment to optimize water use $2,598 $104
DL0247 #07 Y:2024 Meter waste water $34,580 $145
TT0320 #05 Y:2024 Meter recycled water (to reduce sewer charges) $6,052 $7,500
NL0101 #02 Y:2024 Use closed cycle process to minimize waste water production $8,730 $7,424