Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,735

matching recommendations
$
$
ARC Water use
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1003 #02 Y:2026 Meter recycled water (to reduce sewer charges) $40,935 -
NL0140 #05 Y:2026 Meter waste water $679 $266
NL0140 #04 Y:2026 Minimize water usage $1,800 $1,421
UD1141 #08 Y:2026 Meter recycled water (to reduce sewer charges) $18,123 $2,500
UU0303 #04 Y:2026 Minimize water usage $56,001 $110,000
MZ0399 #05 Y:2026 Minimize contamination of water before treatment $353,094 $600,000
NL0136 #05 Y:2026 Meter waste water $1,962 $2,300
IC0352 #04 Y:2026 Minimize water usage $63 -
IC0351 #06 Y:2026 Use flow control valves on equipment to optimize water use $479 $728
NL0134 #01 Y:2026 Meter recycled water (to reduce sewer charges) $90,322 $5,410
IC0348 #10 Y:2026 Minimize water usage $92 $541
SU0598 #06 Y:2026 Use closed cycle process to minimize waste water production $2,680 $9,976
SU0597 #11 Y:2026 Replace treated water with well / surface water $11,059 $38,105
SU0596 #10 Y:2026 Minimize water usage $7,684 $58,011
AS0615 #06 Y:2026 Treat and reuse rinse waters $984 $6,104
UD1136 #01 Y:2026 Use flow control valves on equipment to optimize water use $37,800 $1,039
DL0272 #03 Y:2026 Minimize water usage $248,000 $200,000
SU0595 #10 Y:2026 Use closed cycle process to minimize waste water production $15,738 $185,000
AM0981 #02 Y:2026 Minimize water usage $3,000 $107
TT0357 #02 Y:2026 Meter waste water $20,750 $5,000