ITAC Assessment: UD1141
ITAC logo
ITAC Assessment: UD1141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product HVAC modules and Radiators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 869
Plant Area 1,300,000
ft2
Annual Production 20,780,261
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,699,659 32,288,930
kWh
Electricity Demand $328,928 60,422
kW-mo/yr
Electricity Fees $82,966 -
Natural Gas $1,485,903 311,238
MMBtu
Fuel Oil #1 $120,866 10,169
MMBtu
Waste Disposal Costs
Water Usage $156,376 36,536
Tgal
Water Disposal $34,369 11,295
Tgal
TOTAL YEARLY COSTS $4,909,067
RECOMMENDED SAVINGS* $237,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $66,211 $13,947 $34,803
416,309
kWh
- - $31,408
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $22,433 $696 $22,433
268,336
kWh
- - - -
03 2.6242: Minimize operation of equipment maintained in standby condition $5,189 - $5,189
61,769
kWh
- - - -
04 2.4113: Install motor voltage controller on lightly loaded motors $4,932 $4,034 $3,776
45,167
kWh
$1,156
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $34,953 $6,400 $31,508
376,889
kWh
$3,445
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $7,415 $16,650 $7,415
88,707
kWh
- - - -
07 2.3212: Optimize plant power factor $78,726 $82,652 - - $78,726 - -
08 3.4116: Meter recycled water (to reduce sewer charges) $18,123 $2,500 - - - - $18,123
-
Tgal
TOTAL RECOMMENDED $237,982 $126,879 $105,124
1,257,177
kWh
$4,601
-
kW-mo/yr
$78,726 $31,408
-
MMBtu
$18,123
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs