| Assessment Year | 2026 |
|---|---|
| Principal Product | HVAC modules and Radiators |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 869 |
| Plant Area |
1,300,000
ft2
|
| Annual Production | 20,780,261
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,699,659 | 32,288,930 |
kWh
|
$0.084 | |
| Electricity Demand | $328,928 | 60,422 |
kW-mo/yr
|
$5.44 | |
| Electricity Fees | $82,966 | - |
|
- | |
| Natural Gas | $1,485,903 | 311,238 |
MMBtu
|
$4.77 | |
| Fuel Oil #1 | $120,866 | 10,169 |
MMBtu
|
$11.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $156,376 | 36,536 |
Tgal
|
$4.28 | |
| Water Disposal | $34,369 | 11,295 |
Tgal
|
$3.04 | |
| TOTAL YEARLY COSTS | $4,909,067 | ||||
| RECOMMENDED SAVINGS* | $237,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $66,211 | $13,947 |
$34,803
416,309
kWh
|
- | - |
$31,408
-
MMBtu
|
- | |
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $22,433 | $696 |
$22,433
268,336
kWh
|
- | - | - | - | |
| 03 | 2.6242: Minimize operation of equipment maintained in standby condition | $5,189 | - |
$5,189
61,769
kWh
|
- | - | - | - | |
| 04 | 2.4113: Install motor voltage controller on lightly loaded motors | $4,932 | $4,034 |
$3,776
45,167
kWh
|
$1,156
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $34,953 | $6,400 |
$31,508
376,889
kWh
|
$3,445
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $7,415 | $16,650 |
$7,415
88,707
kWh
|
- | - | - | - | |
| 07 | 2.3212: Optimize plant power factor | $78,726 | $82,652 | - | - | $78,726 | - | - | |
| 08 | 3.4116: Meter recycled water (to reduce sewer charges) | $18,123 | $2,500 | - | - | - | - |
$18,123
-
Tgal
|
|
| TOTAL RECOMMENDED | $237,982 | $126,879 |
$105,124
1,257,177
kWh
|
$4,601
-
kW-mo/yr
|
$78,726 |
$31,408
-
MMBtu
|
$18,123
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs