Assessment Year | 1995 |
---|---|
Principal Product | Engine Ignition Systems |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
73,350
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $378,842 | 5,714,830 |
kWh
|
$0.066 |
Natural Gas | $33,353 | 5,314 |
MMBtu
|
$6.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,099 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,984 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,084 | $3,497 |
$6,084
102,579
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,601 | $6,761 |
$2,601
37,515
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $146 | $280 |
$146
2,345
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $143 | $128 |
$143
2,931
kWh
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $774 | $1,819 |
$774
12,016
kWh
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $34,974 | - |
$34,974
395,369
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,816 | $42,705 |
$15,816
272,567
kWh
|
- | |
08 | 2.7271: Replace electric reheat with heat pipes | $18,904 | $31,500 |
$18,904
829,719
kWh
|
- | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $3,373 | $9,000 |
$3,373
50,410
kWh
|
- | |
10 | 3.3125: Use distillation, evaporation to remove contaminants | $2,754 | $4,450 | - |
$2,754
-
gal
|
|
11 | 3.1131: Use mechanical stripping methods | $4,715 | $82 | - |
$4,715
-
gal
|
|
12 | 3.3122: Use filtration, centrifuging to remove contaminants | $3,815 | $2,500 | - |
$3,815
-
gal
|
|
TOTAL RECOMMENDED | $94,099 | $102,722 |
$82,815
1,705,451
kWh
|
$11,284
-
gal
|
||
TOTAL IMPLEMENTED | $8,984 | $8,227 |
$6,230
104,924
kWh
|
$2,754
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs