ITAC Assessment: SF0652
ITAC logo
ITAC Assessment: SF0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 260,000
ft2
Annual Production 90,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,245,875 28,888,504
kWh
Electricity Demand $479,624 55,358
kW-mo/yr
Natural Gas $2,455 105
MMBtu
Waste Disposal Costs
Water Usage $134,503 68,052
Tgal
Water Disposal $137,597 13,523
Tgal
TOTAL YEARLY COSTS $4,000,054
RECOMMENDED SAVINGS* $153,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,138 $7,872 $21,138
188,065
kWh
- - - - - -
02 2.7224: Reduce space conditioning during non-working hours $5,780 $4,983 $5,780
51,426
kWh
- - - - - -
03 2.3132: Recharge batteries on during off-peak demand periods $4,938 $5,263 - $2,095
-
kW-mo/yr
$2,843 - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $313 $462 $270
2,400
kWh
$44
-
kW-mo/yr
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,632 $21,317 $7,632
67,908
kWh
- - - - - -
06 2.7134: Use photocell controls $2,716 $12,669 $1,929
17,164
kWh
- - - - $81 $706
07 3.4114: Replace city water with recycled water via cooling tower $111,329 $388,045 $(-4,853.0)
(-43,174)
kWh
- - $20,171
-
Tgal
$103,865
-
Tgal
$(-7,854.0) -
TOTAL RECOMMENDED $153,847 $440,611 $31,896
283,789
kWh
$2,139
-
kW-mo/yr
$2,843 $20,171
-
Tgal
$103,865
-
Tgal
$(-7,773.0) $706
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs