ITAC Assessment: CL2113
ITAC logo
ITAC Assessment: CL2113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 100,000
ft2
Annual Production 5,900,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,483 13,817,004
kWh
Electricity Demand $288,762 30,184
kW-mo/yr
TOTAL YEARLY COSTS $712,245
RECOMMENDED SAVINGS* $80,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,351 $62,500 $25,584
852,811
kWh
$8,767
-
kW-mo/yr
-
02 4.463: Modify facility to avoid excess maintenance costs $35,000 $12,000 - - $35,000
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,986 $400 - $10,986
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,337 $74,900 $25,584
852,811
kWh
$19,753
-
kW-mo/yr
$35,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs