ITAC Assessment: IA0376
ITAC logo
ITAC Assessment: IA0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product soybean flakes
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2075: Soybean Oil Mills
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 24,200
ft2
Annual Production 3,800
ton
Production Hrs. Annual 1,105
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,309 748,080
kWh
Electricity Fees $308 -
Natural Gas $49,935 5,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $464 $1,482 $464
5,415
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $550 $50 $550
6,429
kWh
-
03 2.4133: Use most efficient type of electric motors $41 $72 $41
359
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,730 $2,211 $1,730
20,224
kWh
-
05 2.1133: Adjust burners for efficient operation $382 $1,000 - $382
-
MMBtu
TOTAL RECOMMENDED $3,167 $4,815 $2,785
32,427
kWh
$382
-
MMBtu
TOTAL IMPLEMENTED $2,703 $3,333 $2,321
27,012
kWh
$382
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs