ITAC Assessment: OR0168
ITAC logo
ITAC Assessment: OR0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Frozen Pumkin
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 5,850
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,603 1,208,382
kWh
Fuel Oil #2 $23,398 4,752
MMBtu
Other Energy $15,552 2,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $2,253 - $2,253
68,288
kWh
-
02 2.1212: Operate boilers on high fire setting $134 - - $134
-
MMBtu
03 2.2447: Heat water with exhaust heat $3,366 $500 - $3,366
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $5,200 $1,152 $5,200
155,041
kWh
-
05 2.4133: Use most efficient type of electric motors $378 $1,008 $378
8,499
kWh
-
06 2.1232: Keep boiler tubes clean $351 $1,000 - $351
-
MMBtu
TOTAL RECOMMENDED $11,682 $3,660 $7,831
231,828
kWh
$3,851
-
MMBtu
TOTAL IMPLEMENTED $11,682 $3,660 $7,831
231,828
kWh
$3,851
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs