| Assessment Year | 2024 |
|---|---|
| Principal Product | Plastic Bottles |
| NAICS | 326160: Plastics Bottle Manufacturing |
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
210,000
ft2
|
| Annual Production | 48,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $209,083 | 3,314,888 |
kWh
|
$0.063 |
| Electricity Demand | $159,644 | 8,939 |
kW-mo/yr
|
$17.86 |
| Electricity Fees | $17,175 | - |
|
- |
| Natural Gas | $11,058 | 1,797 |
MMBtu
|
$6.15 |
| TOTAL YEARLY COSTS | $396,960 | |||
| RECOMMENDED SAVINGS* | $279,986 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $28,874 | $11,700 | - | - | $28,874 | |
| 02 | 2.8114: Change rate schedules or other changes in utility service | $72,820 | - | - | - | $72,820 | |
| 03 | 2.2692: Use outside cold water source as a supply of cooling water | $62,771 | $58,367 |
$40,075
635,367
kWh
|
$22,696
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,257 | $2,700 |
$6,257
99,153
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,401 | $2,438 |
$4,401
70,311
kWh
|
- | - | |
| 06 | 2.9114: Use solar heat to make electricty | $104,863 | $758,879 |
$69,697
1,104,561
kWh
|
$35,166
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $279,986 | $834,084 |
$120,430
1,909,392
kWh
|
$57,862
-
kW-mo/yr
|
$101,694 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs