ITAC Assessment: ND0162
ITAC logo
ITAC Assessment: ND0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Springs and Steel Stampings
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 400,000
ft2
Annual Production 7,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,717 6,250,293
kWh
Natural Gas $242,673 91,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,484 $11,590 $4,484
86,753
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $16,677 $9,940 - $16,677
-
MMBtu
03 2.7261: Install timers and/or thermostats $8,311 $4,500 - $8,311
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,926 $500 $4,926
94,959
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $3,324 $2,000 $3,324
64,185
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,041 $1,171 $1,041
20,223
kWh
-
07 2.3212: Optimize plant power factor $1,042 $600 $1,042
-
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $84 $120 $84
1,758
kWh
-
TOTAL RECOMMENDED $39,889 $30,421 $14,901
267,878
kWh
$24,988
-
MMBtu
TOTAL IMPLEMENTED $14,278 $6,171 $5,967
115,182
kWh
$8,311
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs