ITAC Assessment: NL0123
ITAC logo
ITAC Assessment: NL0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Processed Sand
NAICS 212322: Industrial Sand Mining
SIC 1446: Industrial Sand
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 255,100
ft2
Annual Production 2,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,806 10,075,200
kWh
Electricity Demand $277,663 36,827
kW-mo/yr
Electricity Fees $206,052 -
Natural Gas $1,209,960 400,751
MMBtu
Fuel Oil #2 $298,680 15,842
MMBtu
Other Gas $248,170 1
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $6,900 600,000
lb
TOTAL YEARLY COSTS $2,707,231
RECOMMENDED SAVINGS* $1,289,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 3.1181: Eliminate a by-product $821,100 $590,100 - - - - - - $821,100
02 2.4325: Upgrade conveyors $229,830 $214,000 - - - $2,880 $(-1,050.0) $228,000 -
03 2.3212: Optimize plant power factor $206,052 $550,650 - - $206,052 - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,122 $24,804 $13,600
298,236
kWh
$3,079
-
kW-mo/yr
- $6,443 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,523 $9,000 $9,423
206,640
kWh
- - $(-800.0) $(-100.0) - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $697 $443 $568
12,464
kWh
$129
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $1,289,324 $1,388,997 $23,591
517,340
kWh
$3,208
-
kW-mo/yr
$206,052 $8,523 $(-1,150.0) $228,000 $821,100
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs