ITAC Assessment: NL0144
ITAC logo
ITAC Assessment: NL0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pet Health and Wellness
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 490,000
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 4,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,527 3,507,072
kWh
Electricity Demand $91,983 10,909
kW-mo/yr
Electricity Fees $26,096 -
Natural Gas $22,876 2,457
MMBtu
Fuel Oil #2 $37,573 1,546
MMBtu
Waste Disposal Costs
Water Usage $7,525 2,374
Tgal
Water Disposal $13,095 2,374
Tgal
Other Liquid (non-haz) $4,658 1
gal
TOTAL YEARLY COSTS $422,333
RECOMMENDED SAVINGS* $1,131,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.114: Add/modify equipment to improve drying process $1,000,000 $4,000,000 - - - $34,638
-
MMBtu
- - $965,362
02 4.112: Replace old machine with new automatic multi-station tool $60,812 $449,510 $1,953
31,500
kWh
$759
-
kW-mo/yr
- - - $58,100 -
03 2.7243: Improve air circulation with destratification fans / other methods $41,053 $15,088 - - $317
-
MMBtu
- - $41,828 $(-1,092.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,667 $35,427 $10,909
175,945
kWh
$4,948
-
kW-mo/yr
- - - $811 -
05 2.7135: Install occupancy sensors $4,260 $6,131 $4,260
68,706
kWh
- - - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,667 $413 $3,667
59,144
kWh
- - - - - -
07 2.4239: Eliminate or reduce compressed air usage $2,434 $12,996 $2,434
39,258
kWh
- - - - - -
08 3.4116: Meter recycled water (to reduce sewer charges) $1,348 $800 - - - - $3,748
-
Tgal
$(-2,400.0) -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $965 $3,202 $1,715
27,668
kWh
- - - - $(-750.0) -
TOTAL RECOMMENDED $1,131,206 $4,523,567 $24,938
402,221
kWh
$5,707
-
kW-mo/yr
$317
-
MMBtu
$34,638
-
MMBtu
$3,748
-
Tgal
$97,589 $964,270
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs