ITAC Assessment: TT0075
ITAC logo
ITAC Assessment: TT0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Elevators
NAICS 333921: Elevator and Moving Stairway Manufacturing
SIC 3534: Elevators and Moving Stairways
Sales Range less than $500
k
# of Employees 578
Plant Area 650,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,031,658 15,983,159
kWh
Electricity Demand $598,450 42,746
kW-mo/yr
Electricity Fees $49,360 -
Natural Gas $576,286 79,769
MMBtu
LPG $154,879 5,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $264,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $36,083 $42,000 - - $36,083
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $109,802 $50,000 - - $109,802
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $47,625 $21,000 - - $47,625
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,202 $14,000 $4,993
125,019
kWh
$9,209
-
kW-mo/yr
- -
05 2.4225: Install common header on compressors $44,869 $32,200 $44,869
1,123,410
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,146 $5,000 $5,146
128,846
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,771 $1,152 - - - $3,771
08 2.2522: Isolate hot or cold equipment $1,379 $2,500 $1,379
18,335
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,369 $5,436 $1,122
28,087
kWh
- - $247
TOTAL RECOMMENDED $264,246 $173,288 $57,509
1,423,697
kWh
$9,209
-
kW-mo/yr
$193,510
-
MMBtu
$4,018
TOTAL IMPLEMENTED $116,992 $75,852 $56,387
1,395,610
kWh
$9,209
-
kW-mo/yr
$47,625
-
MMBtu
$3,771
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs