ITAC Assessment: OR0217
ITAC logo
ITAC Assessment: OR0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Band & Circular Saws, Knives
NAICS
n/a
SIC 3553: Woodworking Machinery
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 4,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,383 4,645,662
kWh
Natural Gas $20,231 4,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,943 $5,465 $2,943
68,288
kWh
- -
02 2.4133: Use most efficient type of electric motors $4,072 $15,891 $4,072
84,408
kWh
- -
03 3.4114: Replace city water with recycled water via cooling tower $1,880 $3,200 - - $1,880
-
Tgal
04 3.4131: Minimize contamination of water before treatment $8,519 $20,000 - - $8,519
-
Tgal
05 3.6192: Use a less expensive method of waste removal $2,470 - - $2,470
-
MMBtu
-
TOTAL RECOMMENDED $19,884 $44,556 $7,015
152,696
kWh
$2,470
-
MMBtu
$10,399
-
Tgal
TOTAL IMPLEMENTED $11,365 $24,556 $7,015
152,696
kWh
$2,470
-
MMBtu
$1,880
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs