| Assessment Year | 2003 |
|---|---|
| Principal Product | Door Frame Parts |
| NAICS | 321911: Wood Window and Door Manufacturing |
| SIC | 2431: Millwork |
| Sales Range | $50 M to 100M |
| # of Employees | 260 |
| Plant Area |
n/a
|
| Annual Production | 27,100,000
thousand feet
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $292,292 | 7,745,142 |
kWh
|
$0.038 |
| Electricity Demand | $97,026 | 290,352 |
kW-mo/yr
|
$0.33 |
| Electricity Fees | $7,867 | - |
|
- |
| Natural Gas | $57,446 | 8,607 |
MMBtu
|
$6.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $585,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $50,680 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.621: Use fixtures to reduce machine changeout times | $508,000 | $28,000 | - | - | - | - | $508,000 | |
| 02 | 2.4323: Use optimum size and capacity equipment | $9,000 | $8,100 |
$9,000
246,000
kWh
|
- | - | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $21,800 | $21,600 |
$15,200
415,000
kWh
|
$6,600
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,100 | $13,000 |
$11,500
314,000
kWh
|
$1,600
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $27,050 | $98,000 |
$12,609
203,800
kWh
|
$6,013
-
kW-mo/yr
|
$406 | $8,022 | - | |
| 06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $6,780 | $26,000 |
$(-2,870.0)
(-92,500)
kWh
|
- | $1,440 | $8,210 | - | |
| TOTAL RECOMMENDED | $585,730 | $194,700 |
$45,439
1,086,300
kWh
|
$14,213
-
kW-mo/yr
|
$1,846 | $16,232 | $508,000 | ||
| TOTAL IMPLEMENTED | $50,680 | $68,700 |
$32,830
882,500
kWh
|
$8,200
-
kW-mo/yr
|
$1,440 | $8,210 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs