ITAC Assessment: OR0446
ITAC logo
ITAC Assessment: OR0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Door Frame Parts
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area
n/a
Annual Production 27,100,000
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,292 7,745,142
kWh
Electricity Demand $97,026 290,352
kW-mo/yr
Electricity Fees $7,867 -
Natural Gas $57,446 8,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $585,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.621: Use fixtures to reduce machine changeout times $508,000 $28,000 - - - - $508,000
02 2.4323: Use optimum size and capacity equipment $9,000 $8,100 $9,000
246,000
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $21,800 $21,600 $15,200
415,000
kWh
$6,600
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,100 $13,000 $11,500
314,000
kWh
$1,600
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,050 $98,000 $12,609
203,800
kWh
$6,013
-
kW-mo/yr
$406 $8,022 -
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $6,780 $26,000 $(-2,870.0)
(-92,500)
kWh
- $1,440 $8,210 -
TOTAL RECOMMENDED $585,730 $194,700 $45,439
1,086,300
kWh
$14,213
-
kW-mo/yr
$1,846 $16,232 $508,000
TOTAL IMPLEMENTED $50,680 $68,700 $32,830
882,500
kWh
$8,200
-
kW-mo/yr
$1,440 $8,210 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs