ITAC Assessment: MZ0399
ITAC logo
ITAC Assessment: MZ0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product dishwashing soap
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range greater than $500
M
# of Employees 500
Plant Area 800,343
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,083,465 56,585,338
kWh
Electricity Demand $1,425,021 95,437
kW-mo/yr
Natural Gas $1,082,376 210,266
MMBtu
Waste Disposal Costs
Water Usage $437,604 177,655
Tgal
Water Disposal $755,886 86,134
Tgal
Other Liquid (haz) $414,894 86,134
gal
TOTAL YEARLY COSTS $6,199,246
RECOMMENDED SAVINGS* $451,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $20,127 $127,250 $12,962
350,319
kWh
$7,165
-
kW-mo/yr
- -
02 2.2625: Chill water to the highest temperature possible $11,556 $7,906 $5,489
148,553
kWh
$6,067
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,377 $30,071 $43,377
1,172,354
kWh
- - -
04 2.4235: Remove or close off unneeded compressed air lines $19,326 $6,650 $12,446
336,384
kWh
$6,880
-
kW-mo/yr
- -
05 3.4131: Minimize contamination of water before treatment $353,094 $600,000 - - $414,894
-
gal
$(-61,800.0)
06 2.6127: Maintain air filters by cleaning or replacement $547 $200 $547
14,728
kWh
- - -
07 2.7135: Install occupancy sensors $864 $930 $864
23,409
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,478 - $1,596
43,146
kWh
$882
-
kW-mo/yr
- -
TOTAL RECOMMENDED $451,369 $773,007 $77,281
2,088,893
kWh
$20,994
-
kW-mo/yr
$414,894
-
gal
$(-61,800.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs