ITAC Assessment: UF0652
ITAC logo
ITAC Assessment: UF0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Reclaimed Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 112,000
ft2
Annual Production 620,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,644 2,869,515
kWh
Electricity Fees $11,478 -
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $459,123
RECOMMENDED SAVINGS* $430,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.9141: Install anaerobic digester $43,759 $200,000 $29,640
190,000
kWh
- $14,119
02 2.3191: Use demand controller or load shedder $31,335 $15,438 $31,335
200,866
kWh
- -
03 2.4133: Use most efficient type of electric motors $13,103 $7,347 $13,103
83,996
kWh
- -
04 2.4313: Provide proper maintenance of motor driven equipment $2,063 - $2,063
12,893
kWh
- -
05 3.4153: Use counter current rinsing to reduce waste water $323,609 $1,053,043 $(-17,082.0)
(-109,500)
kWh
$1,668 $339,023
06 3.6112: Use filter and drying oven to reduce sludge volume $12,547 $30,000 $(-1,014.0)
(-6,500)
kWh
- $13,561
07 3.4141: Replace the chlorination stage with an oxygen or ozone stage $3,650 $7,600 - - $3,650
TOTAL RECOMMENDED $430,066 $1,313,428 $58,045
371,755
kWh
$1,668 $370,353
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs