| Assessment Year | 2026 |
|---|---|
| Principal Product | Reclaimed Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 15 |
| Plant Area |
112,000
ft2
|
| Annual Production | 620,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $447,644 | 2,869,515 |
kWh
|
$0.16 | |
| Electricity Fees | $11,478 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $459,123 | ||||
| RECOMMENDED SAVINGS* | $430,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9141: Install anaerobic digester | $43,759 | $200,000 |
$29,640
190,000
kWh
|
- | $14,119 | |
| 02 | 2.3191: Use demand controller or load shedder | $31,335 | $15,438 |
$31,335
200,866
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $13,103 | $7,347 |
$13,103
83,996
kWh
|
- | - | |
| 04 | 2.4313: Provide proper maintenance of motor driven equipment | $2,063 | - |
$2,063
12,893
kWh
|
- | - | |
| 05 | 3.4153: Use counter current rinsing to reduce waste water | $323,609 | $1,053,043 |
$(-17,082.0)
(-109,500)
kWh
|
$1,668 | $339,023 | |
| 06 | 3.6112: Use filter and drying oven to reduce sludge volume | $12,547 | $30,000 |
$(-1,014.0)
(-6,500)
kWh
|
- | $13,561 | |
| 07 | 3.4141: Replace the chlorination stage with an oxygen or ozone stage | $3,650 | $7,600 | - | - | $3,650 | |
| TOTAL RECOMMENDED | $430,066 | $1,313,428 |
$58,045
371,755
kWh
|
$1,668 | $370,353 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs