ITAC Assessment: MA0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SYNTHETIC THREAD
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 0
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,331 5,058,617
kWh
Natural Gas $79,303 15,797
MMBtu
Fuel Oil #6 $24,569 4,578
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1213: Direct warmest air to combustion intake $1,039 $750 - $793
-
MMBtu
$246
-
MMBtu
-
02 2.2511: Insulate bare equipment $2,040 $2,900 - $1,556
-
MMBtu
$484
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,162 $8,300 $24,100
323,857
kWh
$(-6,938.0)
-
MMBtu
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $900 $2,090 - $900
-
MMBtu
- -
05 2.2113: Repair or replace steam traps $26,958 $10,450 - $22,945
-
MMBtu
$7,013
-
MMBtu
$(-3,000.0)
06 2.4131: Size electric motors for peak operating efficiency $12,086 $31,425 $12,086
162,368
kWh
- - -
TOTAL RECOMMENDED $60,185 $55,915 $36,186
486,225
kWh
$19,256
-
MMBtu
$7,743
-
MMBtu
$(-3,000.0)
TOTAL IMPLEMENTED $59,146 $55,165 $36,186
486,225
kWh
$18,463
-
MMBtu
$7,497
-
MMBtu
$(-3,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs