Assessment Year | 1986 |
---|---|
Principal Product | SYNTHETIC THREAD |
NAICS |
n/a
|
SIC | 2299: Textile goods, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,331 | 5,058,617 |
kWh
|
$0.074 |
Natural Gas | $79,303 | 15,797 |
MMBtu
|
$5.02 |
Fuel Oil #6 | $24,569 | 4,578 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,185 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,146 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $1,039 | $750 | - |
$793
-
MMBtu
|
$246
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $2,040 | $2,900 | - |
$1,556
-
MMBtu
|
$484
-
MMBtu
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $17,162 | $8,300 |
$24,100
323,857
kWh
|
$(-6,938.0)
-
MMBtu
|
- | - | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $900 | $2,090 | - |
$900
-
MMBtu
|
- | - | |
05 | 2.2113: Repair or replace steam traps | $26,958 | $10,450 | - |
$22,945
-
MMBtu
|
$7,013
-
MMBtu
|
$(-3,000.0) | |
06 | 2.4131: Size electric motors for peak operating efficiency | $12,086 | $31,425 |
$12,086
162,368
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $60,185 | $55,915 |
$36,186
486,225
kWh
|
$19,256
-
MMBtu
|
$7,743
-
MMBtu
|
$(-3,000.0) | ||
TOTAL IMPLEMENTED | $59,146 | $55,165 |
$36,186
486,225
kWh
|
$18,463
-
MMBtu
|
$7,497
-
MMBtu
|
$(-3,000.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs