Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $48,900 | 1,275,680 |
kWh
|
$0.038 |
| Electricity Demand | $62,200 | 5,244 |
kW-mo/yr
|
$11.86 |
| Natural Gas | $7,641 | 1,083 |
MMBtu
|
$7.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,005 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,720 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.424: Improve space comfort conditioning | $30,335 | $50,000 | - | - | - | $3,085 | $27,250 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,720 | $11,700 |
$1,400
40,000
kWh
|
$1,320
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $2,600 | $4,625 |
$1,730
52,400
kWh
|
$870
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.6241: Reduce temperature of process equipment when on standby | $1,225 | - |
$1,225
37,065
kWh
|
- | - | - | - | |
| 05 | 3.4116: Meter recycled water (to reduce sewer charges) | $925 | - | - | - |
$925
-
Tgal
|
- | - | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $200 | - |
$200
6,000
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $38,005 | $66,325 |
$4,555
135,465
kWh
|
$2,190
-
kW-mo/yr
|
$925
-
Tgal
|
$3,085 | $27,250 | ||
| TOTAL IMPLEMENTED | $2,720 | $11,700 |
$1,400
40,000
kWh
|
$1,320
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs