| Assessment Year | 2026 |
|---|---|
| Principal Product | Beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
93,000
ft2
|
| Annual Production | 55,000
bbl
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Hawaii |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $423,709 | 1,337,105 |
kWh
|
$0.32 | |
| Electricity Demand | $116,689 | 3,346 |
kW-mo/yr
|
$34.87 | |
| Electricity Fees | $540,398 | - |
|
- | |
| Natural Gas | $168,316 | 5,643 |
MMBtu
|
$29.83 | |
| Waste Disposal Costs | |||||
| Water Usage | $54,963 | 8,940 |
Tgal
|
$6.15 | |
| Water Disposal | $69,820 | 7,377 |
Tgal
|
$9.46 | |
| TOTAL YEARLY COSTS | $1,373,895 | ||||
| RECOMMENDED SAVINGS* | $524,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $767 | - |
$667
2,103
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $492 | $1,850 |
$428
1,350
kWh
|
$64
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,628 | - |
$3,373
10,640
kWh
|
$255
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $4,351 | $4,420 | - | - |
$4,351
-
MMBtu
|
- | - | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $512 | $929 |
$512
1,616
kWh
|
- | - | - | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,841 | $3,566 |
$1,041
3,284
kWh
|
$800
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $26,938 | $7,246 |
$26,938
84,978
kWh
|
- | - | - | - | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $3,606 | $733 | - | - |
$3,606
-
MMBtu
|
- | - | - | |
| 09 | 2.2621: Modify refrigeration system to operate at a lower pressure | $40,591 | $67,196 |
$37,766
119,136
kWh
|
$2,825
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 4.212: Adopt in-house material generation | $440,085 | $81,519 |
$(-874.0)
(-2,756)
kWh
|
$(-38.0)
-
kW-mo/yr
|
- | - | - | $440,997 | |
| 11 | 3.4151: Minimize water usage | $2,103 | $11,327 | - | - | - |
$736
-
Tgal
|
$1,367
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $524,914 | $178,786 |
$69,851
220,351
kWh
|
$4,006
-
kW-mo/yr
|
$7,957
-
MMBtu
|
$736
-
Tgal
|
$1,367
-
Tgal
|
$440,997 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs