ITAC Assessment: SJ0057
ITAC logo
ITAC Assessment: SJ0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 93,000
ft2
Annual Production 55,000
bbl
Production Hrs. Annual 3,900
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,709 1,337,105
kWh
Electricity Demand $116,689 3,346
kW-mo/yr
Electricity Fees $540,398 -
Natural Gas $168,316 5,643
MMBtu
Waste Disposal Costs
Water Usage $54,963 8,940
Tgal
Water Disposal $69,820 7,377
Tgal
TOTAL YEARLY COSTS $1,373,895
RECOMMENDED SAVINGS* $524,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $767 - $667
2,103
kWh
$100
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $492 $1,850 $428
1,350
kWh
$64
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,628 - $3,373
10,640
kWh
$255
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $4,351 $4,420 - - $4,351
-
MMBtu
- - -
05 2.6231: Utilize controls to operate equipment only when needed $512 $929 $512
1,616
kWh
- - - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,841 $3,566 $1,041
3,284
kWh
$800
-
kW-mo/yr
- - - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $26,938 $7,246 $26,938
84,978
kWh
- - - - -
08 2.2136: Install / repair insulation on steam lines $3,606 $733 - - $3,606
-
MMBtu
- - -
09 2.2621: Modify refrigeration system to operate at a lower pressure $40,591 $67,196 $37,766
119,136
kWh
$2,825
-
kW-mo/yr
- - - -
10 4.212: Adopt in-house material generation $440,085 $81,519 $(-874.0)
(-2,756)
kWh
$(-38.0)
-
kW-mo/yr
- - - $440,997
11 3.4151: Minimize water usage $2,103 $11,327 - - - $736
-
Tgal
$1,367
-
Tgal
-
TOTAL RECOMMENDED $524,914 $178,786 $69,851
220,351
kWh
$4,006
-
kW-mo/yr
$7,957
-
MMBtu
$736
-
Tgal
$1,367
-
Tgal
$440,997
TOTAL IMPLEMENTED - - - - - - - -