ITAC Assessment: NL0140
ITAC logo
ITAC Assessment: NL0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Turbine Blades
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 322,000
ft2
Annual Production 500
units
Production Hrs. Annual 5,760
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,541 9,070,480
kWh
Electricity Demand $382,971 43,300
kW-mo/yr
Electricity Fees $28,583 -
Natural Gas $381,504 53,025
MMBtu
Other Gas $14,152 1
MMBtu
Waste Disposal Costs
Water Usage $8,184 1,826
Tgal
Water Disposal $7,674 1,826
Tgal
Other Liquid (non-haz) $3,210 1
gal
TOTAL YEARLY COSTS $1,358,820
RECOMMENDED SAVINGS* $440,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $416,101 $2,777,776 $109,781
1,860,702
kWh
$306,320
-
kW-mo/yr
- - - - -
02 2.7444: Close holes and openings in building such as broken windows $19,000 $71,896 - - - - - - $19,000
03 2.2615: Clean condenser tubes $2,993 $50 $3,393
57,508
kWh
- - - $(-400.0) - -
04 3.4151: Minimize water usage $1,800 $1,421 - - $336
-
Tgal
- $1,350 $114 -
05 3.4155: Meter waste water $679 $266 - - - $679
-
Tgal
- - -
TOTAL RECOMMENDED $440,573 $2,851,409 $113,174
1,918,210
kWh
$306,320
-
kW-mo/yr
$336
-
Tgal
$679
-
Tgal
$950 $114 $19,000
TOTAL IMPLEMENTED - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs