ITAC Assessment: UF0324
ITAC logo
ITAC Assessment: UF0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Herbicides, Fungicides, Pesticides
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 65,000
ft2
Annual Production 4,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,562 5,475,637
kWh
Electricity Fees $20,330 -
Natural Gas $56,051 12,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,331 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $3,391 $5,036 $3,391
59,487
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,045 $1,420 $2,045
35,878
kWh
- - - -
03 2.7135: Install occupancy sensors $1,411 $546 $1,411
24,757
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $836 $1,211 $836
14,661
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,166 - $1,056
18,528
kWh
- - $50 $60
06 3.3131: Use evaporation to concentrate material $17,482 $13,000 - $(-2,180.0)
-
MMBtu
$19,662
-
Tgal
- -
TOTAL RECOMMENDED $26,331 $21,213 $8,739
153,311
kWh
$(-2,180.0)
-
MMBtu
$19,662
-
Tgal
$50 $60
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs