ITAC Assessment: OR0345
ITAC logo
ITAC Assessment: OR0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Paper Rolls
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 50,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,484 1,572,978
kWh
Electricity Demand $9,248 42,684
kW-mo/yr
Electricity Fees $2,287 -
Natural Gas $11,822 2,457
MMBtu
LPG $12,223 986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.445: Install equipment to move product $22,460 $13,140 $(-170.0)
(-2,052)
kWh
$(-120.0)
-
kW-mo/yr
- - - $22,750 -
02 2.1332: Convert combustion equipment to burn natural gas $6,490 $44,000 $(-30.0)
(-1,172)
kWh
- $(-4,520.0)
-
MMBtu
$12,220
-
MMBtu
- $(-1,180.0) -
03 2.7111: Reduce illumination to minimum necessary levels $4,284 $65 $2,336
100,821
kWh
- - - - $75 $1,873
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $446 $1,000 $387
16,706
kWh
$59
-
kW-mo/yr
- - - - -
05 3.6125: Sell combustible waste $2,590 - - - - - $2,590
-
lb
- -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $1,560 $9,635 $(-197.0)
(-1,465)
kWh
$(-163.0)
-
kW-mo/yr
- - $3,230
-
lb
$(-1,310.0) -
TOTAL RECOMMENDED $37,830 $67,840 $2,326
112,838
kWh
$(-224.0)
-
kW-mo/yr
$(-4,520.0)
-
MMBtu
$12,220
-
MMBtu
$5,820
-
lb
$20,335 $1,873
TOTAL IMPLEMENTED $446 $1,000 $387
16,706
kWh
$59
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs