ITAC Assessment: CO0348
ITAC logo
ITAC Assessment: CO0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rotation molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 45,000
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,406 779,308
kWh
Natural Gas $54,055 13,674
MMBtu
LPG $1,632 104
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,400 $8,810 $2,400
45,428
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,870 - $1,870
-
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,260 $400 $1,260
26,964
kWh
- -
04 2.1332: Convert combustion equipment to burn natural gas $1,425 $3,020 - $(-207.0)
-
MMBtu
$1,632
-
MMBtu
05 2.4131: Size electric motors for peak operating efficiency $310 $1,745 $310
5,862
kWh
- -
TOTAL RECOMMENDED $7,265 $13,975 $5,840
78,254
kWh
$(-207.0)
-
MMBtu
$1,632
-
MMBtu
TOTAL IMPLEMENTED $3,970 $10,955 $3,970
78,254
kWh
- -