ITAC Assessment: LE0257
ITAC logo
ITAC Assessment: LE0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Folding Cartons
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 117,000
ft2
Annual Production 7,364
ton
Production Hrs. Annual 8,568
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,950 1,764,000
kWh
Electricity Demand $21,382 3,362
kW-mo/yr
Natural Gas $103,930 9,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2211: Use optimum temperature $14,693 $3,500 - - $14,693
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,241 $10,000 $10,673
201,372
kWh
$2,568
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,861 $6,000 $9,299
175,446
kWh
$1,562
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,031 - $851
16,062
kWh
$180
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $661 $800 $524
9,894
kWh
$137
-
kW-mo/yr
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $641 $2,000 - $641
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,008 $5,752 $2,575
48,581
kWh
$433
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $1,047 $150 $1,047
19,741
kWh
- -
TOTAL RECOMMENDED $45,183 $28,202 $24,969
471,096
kWh
$5,521
-
kW-mo/yr
$14,693
-
MMBtu
TOTAL IMPLEMENTED $16,771 $3,650 $1,898
35,803
kWh
$180
-
kW-mo/yr
$14,693
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs