ITAC Assessment: UF0651
ITAC logo
ITAC Assessment: UF0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Malt Beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 40,000
ft2
Annual Production 124
Tgal
Production Hrs. Annual 4,015
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,270 327,080
kWh
Electricity Demand $12,361 1,040
kW-mo/yr
Electricity Fees $20,651 -
Natural Gas $54,550 4,840
MMBtu
Waste Disposal Costs
Water Usage $2,827 690
Tgal
Water Disposal $5,328 690
Tgal
TOTAL YEARLY COSTS $119,987
RECOMMENDED SAVINGS* $194,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $75,000 $5,000 - - - - $75,000
02 2.9114: Use solar heat to make electricty $16,306 $80,227 $9,888
133,626
kWh
$6,418
-
kW-mo/yr
- - -
03 2.9112: Use solar heat to heat water $13,638 $31,360 - - $13,638
-
MMBtu
- -
04 2.7425: Clean or color roof to reduce solar load $2,970 $7,320 $2,970
40,138
kWh
- - - -
05 3.4155: Meter waste water $4,190 $4,384 - - - - $4,190
06 4.446: Automate finishing process $67,638 $48,000 $(-5,079.0)
(-68,640)
kWh
$(-3,423.0)
-
kW-mo/yr
- $68,640 $7,500
07 4.424: Improve space comfort conditioning $14,650 $6,200 $(-310.0)
(-4,188)
kWh
$(-213.0)
-
kW-mo/yr
- - $15,173
08 4.513: Re-arrange equipment layout to reduce labor costs $605 $1,760 - - - - $605
TOTAL RECOMMENDED $194,997 $184,251 $7,469
100,936
kWh
$2,782
-
kW-mo/yr
$13,638
-
MMBtu
$68,640 $102,468
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs