| Assessment Year | 1989 |
|---|---|
| Principal Product | CORRUGATED BOXES |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 78 |
| Plant Area |
n/a
|
| Annual Production | 176,000
thousand feet
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $81,559 | 1,063,892 |
kWh
|
$0.077 |
| Natural Gas | $63,278 | 19,983 |
MMBtu
|
$3.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,216 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,083 | - |
$1,083
14,068
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,074 | $251 |
$2,074
26,964
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,444 | - |
$1,444
18,757
kWh
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $748 | - |
$748
9,672
kWh
|
- | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $9,848 | $6,800 | - |
$9,848
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,797 | $500 | - |
$3,797
-
MMBtu
|
|
| 07 | 2.7229: Air condition only space necessary | $3,475 | $6,100 | - |
$3,475
-
MMBtu
|
|
| 08 | 2.2135: Repair and eliminate steam leaks | $3,059 | $800 | - |
$3,059
-
MMBtu
|
|
| TOTAL RECOMMENDED | $25,528 | $14,451 |
$5,349
69,461
kWh
|
$20,179
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,216 | $1,051 |
$3,157
41,032
kWh
|
$3,059
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs