ITAC Assessment: TN0598
ITAC logo
ITAC Assessment: TN0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Forming fabric
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 160,500
ft2
Annual Production 754
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,497 9,406,800
kWh
Electricity Demand $141,827 17,617
kW-mo/yr
Electricity Fees $10,031 -
Natural Gas $105,399 17,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $390,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 3.1192: Reduce scrap production $151,000 $13,920 n/a - - $134,000
-
lb
$17,000 - - -
02 3.5311: Recover and reuse waste material $95,500 $12,800 n/a $(-1,000.0)
(-21,981)
kWh
- $4,800
-
lb
$(-64,300.0) - $156,000 -
03 4.421: Modify current incentive program $59,900 $10,000 n/a - - - - $(-25,000.0) - $84,900
04 4.321: Optimize production lot sizes and inventories $33,035 $13,000 n/a - - - $5,620 $25,615 $1,800 -
05 2.7226: Use computer programs to optimize hvac performance $30,661 $92,600 n/a $13,325
444,314
kWh
$17,336
-
MMBtu
- - - - -
06 2.7226: Use computer programs to optimize hvac performance $7,685 $13,600 n/a $7,685
256,155
kWh
- - - - - -
07 3.6192: Use a less expensive method of waste removal $5,900 - n/a - $7,900
-
MMBtu
- $(-2,000.0) - - -
08 2.7111: Reduce illumination to minimum necessary levels $4,530 $9,800 n/a $4,530
150,938
kWh
- - - - - -
09 2.2437: Recover waste heat from equipment $2,196 $4,750 n/a - $2,196
-
MMBtu
- - - - -
TOTAL RECOMMENDED $390,407 $170,470 $24,540
829,426
kWh
$27,432
-
MMBtu
$138,800
-
lb
$(-43,680.0) $615 $157,800 $84,900
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs