Assessment Year | 1996 |
---|---|
Principal Product | Telescoping and Articulating Cranes |
NAICS |
n/a
|
SIC | 3591: |
Sales Range | $50 M to 100M |
# of Employees | 370 |
Plant Area |
221,520
ft2
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 6,720
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $130,134 | 6,751,172 |
kWh
|
$0.019 |
Electricity Demand | $150,967 | 15,310 |
kW-mo/yr
|
$9.86 |
Natural Gas | $78,091 | 29,225 |
MMBtu
|
$2.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,233 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.8142: Distill contaminated solvents for reuse | $23,485 | $6,060 |
$(-755.0)
(-14,654)
kWh
|
- |
$12,096
-
gal
|
$(-2,640.0) | - | $14,784 | |
02 | 4.231: Purchase equipment instead of leasing | $8,070 | $2,075 | - | - |
$(-2,850.0)
-
gal
|
$(-1,080.0) | $12,000 | - | |
03 | 2.3212: Optimize plant power factor | $4,367 | $7,650 | - |
$4,367
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,980 | $236 |
$1,998
112,837
kWh
|
$1,982
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,938 | $556 |
$1,473
83,236
kWh
|
$1,465
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,642 | $1,500 |
$601
33,998
kWh
|
$1,041
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4314: Use synthetic lubricant | $821 | $299 |
$342
19,343
kWh
|
$345
-
kW-mo/yr
|
- | - | - | $134 | |
TOTAL RECOMMENDED | $45,303 | $18,376 |
$3,659
234,760
kWh
|
$9,200
-
kW-mo/yr
|
$9,246
-
gal
|
$(-3,720.0) | $12,000 | $14,918 | ||
TOTAL IMPLEMENTED | $37,233 | $16,301 |
$3,659
234,760
kWh
|
$9,200
-
kW-mo/yr
|
$12,096
-
gal
|
$(-2,640.0) | - | $14,918 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs