ITAC Assessment: AM0397
ITAC logo
ITAC Assessment: AM0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Oriented strand board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 213,000
ft2
Annual Production 310,000
thousand feet
Production Hrs. Annual 8,448
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,687,352 73,062,000
kWh
Electricity Demand $852,823 128,190
kW-mo/yr
Natural Gas $2,233,929 600,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $67,500 $1,500 - - $67,500
-
MMBtu
- -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $24,500 - - - - - $24,500
-
lb
03 2.3212: Optimize plant power factor $20,000 $60,000 - $20,000
-
kW-mo/yr
- - -
04 3.6192: Use a less expensive method of waste removal $18,400 - - - - - $18,400
-
lb
05 2.4314: Use synthetic lubricant $13,950 - $11,250
268,000
kWh
$2,700
-
kW-mo/yr
- - -
06 2.1121: Use insulation in furnaces to facilitate heating / cooling $11,700 $1,400 - - - - $11,700
-
lb
07 2.7124: Make a practice of turning off lights when not needed $5,700 - $3,800
90,000
kWh
$1,900
-
kW-mo/yr
- - -
08 3.6194: Ship hydraulic oil to secondary fuel program $600 - - - - $600
-
gal
-
TOTAL RECOMMENDED $162,350 $62,900 $15,050
358,000
kWh
$24,600
-
kW-mo/yr
$67,500
-
MMBtu
$600
-
gal
$54,600
-
lb
TOTAL IMPLEMENTED $68,600 $60,000 $3,800
90,000
kWh
$21,900
-
kW-mo/yr
- - $42,900
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs