| Assessment Year | 2017 |
|---|---|
| Principal Product | Beverage dispensing and refrigeration products |
| NAICS | 333241: Food Product Machinery Manufacturing |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 290 |
| Plant Area |
300,000
ft2
|
| Annual Production | 1,100,000
pieces
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $303,952 | 4,926,321 |
kWh
|
$0.062 | |
| Electricity Demand | $130,238 | 9,634 |
kW-mo/yr
|
$13.52 | |
| Electricity Fees | $23,428 | - |
|
- | |
| Natural Gas | $75,299 | 14,245 |
MMBtu
|
$5.29 | |
| Waste Disposal Costs | |||||
| Water Usage | $44,590 | 8,207,626 |
Tgal
|
$0.005 | |
| TOTAL YEARLY COSTS | $577,507 | ||||
| RECOMMENDED SAVINGS* | $50,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $16,921 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $21,176 | $32,727 |
$13,781
223,302
kWh
|
$7,395
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,921 | $18,856 |
$11,013
178,429
kWh
|
$5,908
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,755 | $3,309 |
$2,335
37,941
kWh
|
$2,420
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,437 | $3,721 |
$1,382
22,298
kWh
|
$2,055
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,074 | - |
$1,452
23,491
kWh
|
$1,622
-
kW-mo/yr
|
- | |
| 06 | 2.2511: Insulate bare equipment | $684 | $1,000 | - | - |
$684
-
MMBtu
|
|
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $235 | $800 |
$154
2,425
kWh
|
$81
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $50,282 | $60,413 |
$30,117
487,886
kWh
|
$19,481
-
kW-mo/yr
|
$684
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,921 | $18,856 |
$11,013
178,429
kWh
|
$5,908
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs