Assessment Year | 2022 |
---|---|
Principal Product | trailer hitches |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
30,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $37,668 | 1,042,006 |
kWh
|
$0.036 | |
Electricity Demand | $57,089 | 3,531 |
kW-mo/yr
|
$16.17 | |
Electricity Fees | $11,985 | - |
|
- | |
Natural Gas | $8,146 | 1,000 |
MMBtu
|
$8.15 | |
Waste Disposal Costs | |||||
Water Usage | $4,543 | 580 |
Tgal
|
$7.83 | |
TOTAL YEARLY COSTS | $119,431 | ||||
RECOMMENDED SAVINGS* | $17,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $15,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.8118: Check for accuracy of utility / power meters | $10,923 | $250 | - |
$10,923
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,577 | $2,577 |
$2,144
59,400
kWh
|
$433
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,732 | $7,647 |
$626
17,340
kWh
|
$1,106
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,096 | $323 |
$455
12,615
kWh
|
$640
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $779 | $750 |
$352
9,746
kWh
|
$427
-
kW-mo/yr
|
- | |
06 | 2.7261: Install timers and/or thermostats | $510 | $640 |
$35
960
kWh
|
- |
$475
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,617 | $12,187 |
$3,612
100,061
kWh
|
$13,529
-
kW-mo/yr
|
$475
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,040 | $9,610 |
$1,468
40,661
kWh
|
$13,096
-
kW-mo/yr
|
$475
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs