ITAC Assessment: UU0196
ITAC logo
ITAC Assessment: UU0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product trailer hitches
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 30,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,500
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,668 1,042,006
kWh
Electricity Demand $57,089 3,531
kW-mo/yr
Electricity Fees $11,985 -
Natural Gas $8,146 1,000
MMBtu
Waste Disposal Costs
Water Usage $4,543 580
Tgal
TOTAL YEARLY COSTS $119,431
RECOMMENDED SAVINGS* $17,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.8118: Check for accuracy of utility / power meters $10,923 $250 - $10,923
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,577 $2,577 $2,144
59,400
kWh
$433
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,732 $7,647 $626
17,340
kWh
$1,106
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,096 $323 $455
12,615
kWh
$640
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $779 $750 $352
9,746
kWh
$427
-
kW-mo/yr
-
06 2.7261: Install timers and/or thermostats $510 $640 $35
960
kWh
- $475
-
MMBtu
TOTAL RECOMMENDED $17,617 $12,187 $3,612
100,061
kWh
$13,529
-
kW-mo/yr
$475
-
MMBtu
TOTAL IMPLEMENTED $15,040 $9,610 $1,468
40,661
kWh
$13,096
-
kW-mo/yr
$475
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs