Assessment Year | 1991 |
---|---|
Principal Product | HARDWARE FOR CONCRETE |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,608 | 3,479,777 |
kWh
|
$0.057 |
Natural Gas | $44,633 | 10,608 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $9,819 | - |
$9,999
-
kWh
|
- | $(-180.0) | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,238 | - |
$2,238
97,304
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,746 | - |
$8,615
165,885
kWh
|
$(-1,061.0)
-
MMBtu
|
$192 | |
04 | 2.2491: Use cooling air which cools hot work pieces for space heating | $1,611 | $2,000 | - |
$1,611
-
MMBtu
|
- | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $3,474 | $11,865 | - |
$3,474
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $24,888 | $13,865 |
$20,852
263,189
kWh
|
$4,024
-
MMBtu
|
$12 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs