ITAC Assessment: UD0342
ITAC logo
ITAC Assessment: UD0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HARDWARE FOR CONCRETE
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,608 3,479,777
kWh
Natural Gas $44,633 10,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $9,819 - $9,999
-
kWh
- $(-180.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,238 - $2,238
97,304
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,746 - $8,615
165,885
kWh
$(-1,061.0)
-
MMBtu
$192
04 2.2491: Use cooling air which cools hot work pieces for space heating $1,611 $2,000 - $1,611
-
MMBtu
-
05 2.7492: Use proper thickness of insulation on building envelope $3,474 $11,865 - $3,474
-
MMBtu
-
TOTAL RECOMMENDED $24,888 $13,865 $20,852
263,189
kWh
$4,024
-
MMBtu
$12
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs