| Assessment Year | 1991 |
|---|---|
| Principal Product | HARDWARE FOR CONCRETE |
| NAICS |
n/a
|
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,600
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $198,608 | 3,479,777 |
kWh
|
$0.057 |
| Natural Gas | $44,633 | 10,608 |
MMBtu
|
$4.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $9,819 | - |
$9,999
-
kWh
|
- | $(-180.0) | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,238 | - |
$2,238
97,304
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,746 | - |
$8,615
165,885
kWh
|
$(-1,061.0)
-
MMBtu
|
$192 | |
| 04 | 2.2491: Use cooling air which cools hot work pieces for space heating | $1,611 | $2,000 | - |
$1,611
-
MMBtu
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $3,474 | $11,865 | - |
$3,474
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $24,888 | $13,865 |
$20,852
263,189
kWh
|
$4,024
-
MMBtu
|
$12 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs