Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,366

matching recommendations
$
$
ARC Thermal systems
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0683 #04 Y:2025 Recover heat from exhausted steam, hot air or hot water $1,279 $3,050
WM0243 #02 Y:2025 Isolate hot or cold equipment $66,001 $40,930
WM0243 #01 Y:2025 Use waste heat from hot flue gases to preheat $103,411 $360,000
WV0682 #07 Y:2025 Chill water to the highest temperature possible $7,508 $5,220
WV0682 #05 Y:2025 Insulate bare equipment $17,044 $488
UC2507 #05 Y:2025 Insulate bare equipment $1,482 $2,236
WV0681 #06 Y:2025 Insulate bare equipment $1,989 $4,797
TT0331 #03 Y:2025 Recover waste heat from equipment $2,170 $3,000
LE0601 #05 Y:2025 Use cooling tower or economizer to replace chiller cooling $18,412 $23,182
IP0211 #08 Y:2025 Install steam trap $2,051 $4,950
IP0211 #07 Y:2025 Eliminate cooling of process streams which subsequently must be heated and vice versa $76,792 $70,000
UL2505 #04 Y:2025 Use optimum thickness insulation $23,183 $32,000
UL2505 #03 Y:2025 Recover waste heat from equipment $14,289 $39,000
DL0259 #05 Y:2025 Use heat in flue gases to preheat products or materials $10,050 $40,000
DL0259 #02 Y:2025 Recover waste heat from equipment $11,620 $30,000
SJ0035 #02 Y:2025 Use waste heat from hot flue gases to preheat $15,438 $13,895
OK1138 #06 Y:2025 Insulate bare equipment $488 $653
OK1138 #04 Y:2025 Recover waste heat from equipment $1,934 $20
LS0725 #01 Y:2025 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $316 $50
UD1112 #06 Y:2025 Utilize a less expensive cooling method $110,329 $50,000