Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,442

matching recommendations
$
$
ARC Thermal systems
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0337 #09 Y:2025 Recover waste heat from equipment $2,714 $5,000
TT0336 #01 Y:2025 Minimize non-essential material in heat treatment process $21,145 $30,000
OK1147 #03 Y:2025 Recover waste heat from equipment $2,712 $1,080
MU0072 #03 Y:2025 Recover waste heat from equipment $38 $271
MU0072 #01 Y:2025 Use heat in flue gases to preheat products or materials $161,393 $126,876
UD1122 #04 Y:2025 Utilize a less expensive cooling method $124 $300
UD1122 #03 Y:2025 Preheat boiler makeup water with waste process heat $1,430 $7,500
UD1117 #06 Y:2025 Recover waste heat from equipment $1,029 $4,975
SJ0038 #04 Y:2025 Re-use or recycle hot or cold process exhaust air $2,538 $13,895
UD1121 #04 Y:2025 Utilize a less expensive cooling method $70 $300
UD1121 #02 Y:2025 Utilize a less expensive cooling method $6,748 $500
UL2509 #05 Y:2025 Use outside cold water source as a supply of cooling water $35,838 $43,234
UD1120 #04 Y:2025 Utilize a less expensive cooling method $120 $300
UD1120 #03 Y:2025 Use hot process fluids to preheat incoming process fluids $767 $10,000
UD1120 #02 Y:2025 Utilize a less expensive cooling method $861 $2,000
UD1120 #01 Y:2025 Utilize a less expensive cooling method $1,599 $2,000
OK1146 #02 Y:2025 Recover waste heat from equipment $1,894 $152
OK1145 #12 Y:2025 Use waste heat from hot flue gases to preheat $7,134 $13,000
MZ0378 #05 Y:2025 Recover waste heat from equipment $10,844 $12,060
UC2509 #07 Y:2025 Insulate bare equipment $8,347 $2,798