| Assessment Year | 2026 |
|---|---|
| Principal Product | Over the counter pharmaceutical products |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $100 M to 500M |
| # of Employees | 190 |
| Plant Area |
95,000
ft2
|
| Annual Production | 400,000,000
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $319,448 | 1,981,317 |
kWh
|
$0.16 |
| Electricity Fees | $15,668 | - |
|
- |
| Natural Gas | $155,560 | 10,954 |
MMBtu
|
$14.20 |
| TOTAL YEARLY COSTS | $490,676 | |||
| RECOMMENDED SAVINGS* | $74,618 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $3,858 | $12,303 |
$3,858
23,930
kWh
|
- | - | |
| 02 | 2.4321: Upgrade obsolete equipment | $6,100 | $30,000 |
$6,100
37,842
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,805 | $16,000 |
$8,805
54,621
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $847 | $450 |
$847
5,256
kWh
|
- | - | |
| 05 | 2.1241: Reduce excessive boiler blowdown | $12,170 | $10,900 | - |
$470
-
MMBtu
|
$11,700 | |
| 06 | 2.2136: Install / repair insulation on steam lines | $3,501 | $8,479 | - |
$3,501
-
MMBtu
|
- | |
| 07 | 2.7135: Install occupancy sensors | $3,534 | $9,900 |
$3,534
21,925
kWh
|
- | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,803 | $5,670 |
$35,803
222,105
kWh
|
- | - | |
| TOTAL RECOMMENDED | $74,618 | $93,702 |
$58,947
365,679
kWh
|
$3,971
-
MMBtu
|
$11,700 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs