ITAC Assessment: UC2614
ITAC logo
ITAC Assessment: UC2614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Over the counter pharmaceutical products
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 190
Plant Area 95,000
ft2
Annual Production 400,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,448 1,981,317
kWh
Electricity Fees $15,668 -
Natural Gas $155,560 10,954
MMBtu
TOTAL YEARLY COSTS $490,676
RECOMMENDED SAVINGS* $74,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $3,858 $12,303 $3,858
23,930
kWh
- -
02 2.4321: Upgrade obsolete equipment $6,100 $30,000 $6,100
37,842
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,805 $16,000 $8,805
54,621
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $847 $450 $847
5,256
kWh
- -
05 2.1241: Reduce excessive boiler blowdown $12,170 $10,900 - $470
-
MMBtu
$11,700
06 2.2136: Install / repair insulation on steam lines $3,501 $8,479 - $3,501
-
MMBtu
-
07 2.7135: Install occupancy sensors $3,534 $9,900 $3,534
21,925
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,803 $5,670 $35,803
222,105
kWh
- -
TOTAL RECOMMENDED $74,618 $93,702 $58,947
365,679
kWh
$3,971
-
MMBtu
$11,700
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs