| Assessment Year | 2021 |
|---|---|
| Principal Product | Plastic materials |
| NAICS | 333120: Construction Machinery Manufacturing |
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 34 |
| Plant Area |
74,981
ft2
|
| Annual Production | 500,000
units
|
| Production Hrs. Annual | 5,070
hrs
|
| Location (State) | Montana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,313 | 658,873 |
kWh
|
$0.063 |
| Electricity Demand | $21,539 | 2,731 |
kW-mo/yr
|
$7.89 |
| Electricity Fees | $34,586 | - |
|
- |
| Natural Gas | $2,700 | 838 |
MMBtu
|
$3.22 |
| TOTAL YEARLY COSTS | $100,138 | |||
| RECOMMENDED SAVINGS* | $11,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,055 | $2,536 |
$1,584
25,259
kWh
|
$471
-
kW-mo/yr
|
|
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $893 | $710 |
$893
14,252
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $8,310 | $527 |
$8,310
132,547
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $272 | $522 |
$198
3,154
kWh
|
$74
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $11,530 | $4,295 |
$10,985
175,212
kWh
|
$545
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs