ITAC Assessment: UC2613
ITAC logo
ITAC Assessment: UC2613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Over the counter pharmaceutical products
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range less than $500
k
# of Employees 500
Plant Area 153,000
ft2
Annual Production 400,000,000
units
Production Hrs. Annual 6,864
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $852,083 10,331,628
kWh
Electricity Demand $74,628 10,680
kW-mo/yr
Electricity Fees $185,332 -
Natural Gas $145,729 10,276
MMBtu
TOTAL YEARLY COSTS $1,257,773
RECOMMENDED SAVINGS* $108,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8123: Pay utility bills on time $39 - - - $39 - -
02 2.4221: Install compressor air intakes in coolest locations $4,579 $12,303 $3,705
44,913
kWh
$874
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $24,244 $42,500 $19,680
238,550
kWh
$4,564
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $16,004 $16,000 $11,409
138,291
kWh
$4,595
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,026 $3,285 $3,686
44,676
kWh
$340
-
kW-mo/yr
- - -
06 2.1241: Reduce excessive boiler blowdown $11,910 $5,450 - - - $210
-
MMBtu
$11,700
07 2.2136: Install / repair insulation on steam lines $3,800 $6,077 - - - $3,800
-
MMBtu
-
08 2.7135: Install occupancy sensors $5,058 $4,425 $4,847
58,766
kWh
$211
-
kW-mo/yr
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,906 $8,049 $31,256
378,858
kWh
$7,650
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $108,566 $98,089 $74,583
904,054
kWh
$18,234
-
kW-mo/yr
$39 $4,010
-
MMBtu
$11,700
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs