ITAC Assessment: IP0223
ITAC logo
ITAC Assessment: IP0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Corrugated and Solid Fiber Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 550,000
ft2
Annual Production 960,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $697,705 13,236,101
kWh
Electricity Demand $530,422 27,314
kW-mo/yr
Electricity Fees $244,369 -
Natural Gas $619,228 75,828
MMBtu
Waste Disposal Costs
Water Usage $65,675 12,239
Tgal
TOTAL YEARLY COSTS $2,157,399
RECOMMENDED SAVINGS* $96,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,392 - $12,246
231,050
kWh
$6,146
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $2,359 - - - $2,359
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $22,280 $2,784 $14,834
279,882
kWh
$7,446
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $32,045 $48,160 - - - $32,045
05 2.2414: Use waste heat from hot flue gases to preheat $19,126 $49,500 - - $19,126
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,719 $9,213 $1,657
31,272
kWh
$1,062
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,921 $109,657 $28,737
542,204
kWh
$14,654
-
kW-mo/yr
$21,485
-
MMBtu
$32,045
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs