ITAC Assessment: OK0740
ITAC logo
ITAC Assessment: OK0740
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Iron castings
NAICS 331511: Iron Foundries
SIC 3322: Malleable Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 80,000
ft2
Annual Production 800,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,736 5,304,000
kWh
Electricity Demand $148,532 32,136
kW-mo/yr
Natural Gas $77,009 7,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $19,199 $3,579 $19,199
483,377
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,981 $360 $5,981
91,305
kWh
-
03 2.2437: Recover waste heat from equipment $6,861 $34,620 - $6,861
-
MMBtu
TOTAL RECOMMENDED $32,041 $38,559 $25,180
574,682
kWh
$6,861
-
MMBtu
TOTAL IMPLEMENTED $5,981 $360 $5,981
91,305
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs