| Assessment Year | 2026 |
|---|---|
| Principal Product | Telecommunications |
| NAICS | 517911: Telecommunications Resellers |
| SIC | 4813: Telephone Communications, Except Radiotelephone |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
63,814
ft2
|
| Annual Production | 1
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $139,652 | 1,400,400 |
kWh
|
$0.100 | |
| Electricity Demand | $15,104 | 2,713 |
kW-mo/yr
|
$5.57 | |
| Natural Gas | $22,482 | 2,220 |
MMBtu
|
$10.13 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,153 | 709 |
Tgal
|
$4.45 | |
| Water Disposal | $6,347 | 635 |
Tgal
|
$10.00 | |
| TOTAL YEARLY COSTS | $186,738 | ||||
| RECOMMENDED SAVINGS* | $76,274 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,863 | $8,362 |
$2,144
21,437
kWh
|
$234
-
kW-mo/yr
|
$1,485 | |
| 02 | 2.7135: Install occupancy sensors | $3,027 | $830 |
$3,027
30,274
kWh
|
- | - | |
| 03 | 2.2622: Replace existing chiller with high efficiency model | $16,712 | $80,000 |
$13,682
136,823
kWh
|
$3,030
-
kW-mo/yr
|
- | |
| 04 | 2.2625: Chill water to the highest temperature possible | $11,036 | $12,400 |
$10,254
102,537
kWh
|
$782
-
kW-mo/yr
|
- | |
| 05 | 2.7229: Air condition only space necessary | $13,313 | $30,376 |
$11,815
118,154
kWh
|
$1,498
-
kW-mo/yr
|
- | |
| 06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $4,015 | $750 |
$3,731
37,317
kWh
|
$284
-
kW-mo/yr
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $24,308 | $160,875 |
$22,654
222,330
kWh
|
$1,654
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $76,274 | $293,593 |
$67,307
668,872
kWh
|
$7,482
-
kW-mo/yr
|
$1,485 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs