ITAC Assessment: LS0826
ITAC logo
ITAC Assessment: LS0826
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Commercial Office Space
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range less than $500
k
# of Employees 10
Plant Area 99,909
ft2
Annual Production 1
units
Production Hrs. Annual 3,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,378 2,207,040
kWh
Electricity Demand $40,681 4,590
kW-mo/yr
TOTAL YEARLY COSTS $205,059
RECOMMENDED SAVINGS* $82,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $3,546 $6,890 $3,546
47,923
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,280 $78,000 $16,622
224,640
kWh
$7,658
-
kW-mo/yr
03 2.2437: Recover waste heat from equipment $875 $5,600 $875
11,828
kWh
-
04 2.7423: Reduce heat gain by window tinting $24,185 $177,207 $24,185
326,821
kWh
-
05 2.2622: Replace existing chiller with high efficiency model $29,676 $360,000 $20,317
274,560
kWh
$9,359
-
kW-mo/yr
TOTAL RECOMMENDED $82,562 $627,697 $65,545
885,772
kWh
$17,017
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs