ITAC Assessment: AT0103
ITAC logo
ITAC Assessment: AT0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MENS AND BOYS SHIRTS
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $1
M
to 5
M
# of Employees 175
Plant Area
n/a
Annual Production 480,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,508 339,977
kWh
Natural Gas $7,795 1,589
MMBtu
Fuel Oil #2 $3,269 553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $1,420 $1,000 $1,420
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $291 $202 $291
3,810
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $448 $200 $448
5,862
kWh
- -
04 2.4312: Improve lubrication practices $369 - $369
4,982
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $148 - $148
2,052
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $176 - - $296
-
MMBtu
$(-120.0)
07 2.1232: Keep boiler tubes clean $397 $400 - $397
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $125 $300 $125
1,758
kWh
- -
TOTAL RECOMMENDED $3,374 $2,102 $2,801
18,464
kWh
$693
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $3,374 $2,102 $2,801
18,464
kWh
$693
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs