Assessment Year | 1988 |
---|---|
Principal Product | MENS AND BOYS SHIRTS |
NAICS |
n/a
|
SIC | 2321: Men's and Boys' Shirts, Except Work Shirts |
Sales Range | $1 M to 5M |
# of Employees | 175 |
Plant Area |
n/a
|
Annual Production | 480,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,508 | 339,977 |
kWh
|
$0.075 |
Natural Gas | $7,795 | 1,589 |
MMBtu
|
$4.91 |
Fuel Oil #2 | $3,269 | 553 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,374 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $1,420 | $1,000 |
$1,420
-
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $291 | $202 |
$291
3,810
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $448 | $200 |
$448
5,862
kWh
|
- | - | |
04 | 2.4312: Improve lubrication practices | $369 | - |
$369
4,982
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $148 | - |
$148
2,052
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $176 | - | - |
$296
-
MMBtu
|
$(-120.0) | |
07 | 2.1232: Keep boiler tubes clean | $397 | $400 | - |
$397
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $125 | $300 |
$125
1,758
kWh
|
- | - | |
TOTAL RECOMMENDED | $3,374 | $2,102 |
$2,801
18,464
kWh
|
$693
-
MMBtu
|
$(-120.0) | ||
TOTAL IMPLEMENTED | $3,374 | $2,102 |
$2,801
18,464
kWh
|
$693
-
MMBtu
|
$(-120.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs