Assessment Year | 1992 |
---|---|
Principal Product | HOME FURNACES |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $5 M to 10M |
# of Employees | 57 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,853 | 746,190 |
kWh
|
$0.088 |
Fuel Oil #2 | $10,601 | 1,448 |
MMBtu
|
$7.32 |
Coal | $24,257 | 8,232 |
MMBtu
|
$2.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,139 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,135 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Coal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,086 | $3,500 |
$1,086
12,309
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $421 | $3,470 |
$522
4,982
kWh
|
- | - | - | $(-101.0) | |
03 | 2.4221: Install compressor air intakes in coolest locations | $500 | $571 |
$500
5,569
kWh
|
- | - | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,450 | $500 | - | - |
$212
-
MMBtu
|
$1,238
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,099 | - |
$2,099
23,740
kWh
|
- | - | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $583 | $500 | - |
$583
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $6,139 | $8,541 |
$4,207
46,600
kWh
|
$583
-
MMBtu
|
$212
-
MMBtu
|
$1,238
-
MMBtu
|
$(-101.0) | ||
TOTAL IMPLEMENTED | $5,135 | $4,571 |
$3,685
41,618
kWh
|
- |
$212
-
MMBtu
|
$1,238
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Coal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs