ITAC Assessment: RU0145
ITAC logo
ITAC Assessment: RU0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HOME FURNACES
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,040
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,853 746,190
kWh
Fuel Oil #2 $10,601 1,448
MMBtu
Coal $24,257 8,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Coal Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,086 $3,500 $1,086
12,309
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $421 $3,470 $522
4,982
kWh
- - - $(-101.0)
03 2.4221: Install compressor air intakes in coolest locations $500 $571 $500
5,569
kWh
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,450 $500 - - $212
-
MMBtu
$1,238
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,099 - $2,099
23,740
kWh
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $583 $500 - $583
-
MMBtu
- - -
TOTAL RECOMMENDED $6,139 $8,541 $4,207
46,600
kWh
$583
-
MMBtu
$212
-
MMBtu
$1,238
-
MMBtu
$(-101.0)
TOTAL IMPLEMENTED $5,135 $4,571 $3,685
41,618
kWh
- $212
-
MMBtu
$1,238
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Coal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs